Federation Centenary Fountains Interim Works

Image
Federation Centenary Fountains
Construction Start Date
August 2025
Completion Date
Early 2026
Temporary Road or Lake Closures
No

Latest updates

February 2026

Consultation for the Federation Centenary Fountain Side gardens occurred in late 2025.  

Across the 21‑day consultation period the NCA received 112 responses. 

Based on the preferential rankings submitted, Option 3 received the highest overall score, followed by Option 2 and then Option 1. 

Planting has begun and will continue over the course of the year as we move between seasons and optimal planting times.  

You can view the full consultation report here

The hard stand plaza is complete. The design was created to compliment the look of the red rock at Parliament House, Rond Terrace and Anzac Parade.  

The hard stand and main paths in the Parkes Place Precinct together had approximately 750 tonnes of new asphalt laid with 3,600m2 of red rock resealed on top.

On this page

Project Summary

The NCA is launching a project to address the state of Federation Centenary Fountains. They have not been functioning since 2014, and in their current form, pose a potential trip/fall risk to visitors in the area.

In the long term the project will see the fountains transformed to include a garden bed element while still retaining a water feature as central element. This will require significant consultation with the public and other relevant stakeholders and will be subject to government priorities and budget.

In the interim, the NCA will be taking measures to make the area presentable and also address the potential risk to visitors in the area. To achieve this, the size and layout of the original Fountains will be retained:

  • The eastern and western fountains will be used to create two garden beds with native plants.
  • The central pool will be used to create a central ‘plaza’ so the space can be walked on and used to accommodate future events in the area. 

The NCA commits further engagement with stakeholders. Community consultation will occur in November 2025. 

You can use the link below to sign up for further updates and to be involved. 

Project Background

The Federation Centenary Fountains are located centrally within the Parliamentary Zone in Parkes Place, at the intersection of the axes between the John Gorton Building and the Treasury Building, and the Land Axis. The Fountains currently comprise of two symmetrical rectangular pools, which are located either side of the square central reflecting pool. 

The Fountains have not operated since 2014 and are in poor condition. In their current state the Fountains are unsightly and detract from the presentation of the National Triangle. They also pose potential safety risks to the public. 

A heritage impact assessment has been completed for the site. The interim works respond to the Commonwealth heritage values of the Parliament House Vista, including maintenance of the land and cross axes, symmetry and balance, and a richness of experiences and precinct uses and narratives. 

Sign up for updates

Receive updates direct to your inbox; simply sign up using the form below

Email subscription link

Previous Updates

December 2025 

Thank you to everyone who shared their feedback regarding the planting of Federation Centenary Fountains Side Gardens. 

The NCA is reviewing the results and will publish the final layout of the gardens in the new year. Planting is scheduled to begin in February 2026. 

The central plaza works continue. The first layer of asphalt has been applied.  Through December and January work will focus on drainage and surrounding paved areas of the plaza.